{"id":1936,"date":"2025-05-05T11:01:07","date_gmt":"2025-05-05T09:01:07","guid":{"rendered":"https:\/\/sedri.akdigital.fr\/?page_id=1936"},"modified":"2026-07-27T15:14:30","modified_gmt":"2026-07-27T13:14:30","slug":"cor","status":"publish","type":"page","link":"https:\/\/www.sedri.fr\/en\/cor\/","title":{"rendered":"Contract with an Obligation of Results (COR)"},"content":{"rendered":"<div id='sec2' class='monolit_sec monolit_page_sec content'>\r\n\r\n \r\n\r\n    <section>\r\n            <div class=\"container\">\r\n                <div class=\"row\">\r\n                <div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element text-intro-2\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<p>Contract with Obligation of Results (COR) is a <strong>The Contract with an Obligation of Results (COR) is an innovative contract structure developed by SEDRI, combining the benefits of an Owner's Representative (AMO) assignment with those of a Property Development Contract (CPI). This arrangement turns the best-efforts obligation of an AMO assignment during the design phase into a true obligation of results under a CPI during the execution phase, providing a flexible and transparent framework with a high level of guarantees for carrying out real estate projects.<\/strong>, combining the advantages of Owner's Representative (AMO) services with those of a Real Estate Development Contract (CPI). This approach makes it possible to evolve the\u2019<strong>duty of care <\/strong>from a project management assistance mission in the design phase to a true <strong>obligation of results <\/strong>of a CPI in the execution phase, thus offering a flexible and transparent framework with a high level of guarantees for conducting real estate operations.<\/p>\n<p>To guarantee that its commitments are met, SEDRI mobilizes its specialized in-house teams covering Owner's Representative services (AMO), Property Development Contracts (CPI), Construction Supervision (MOEX) and Scheduling &amp; Coordination (OPC). This integrated organization ensures tight control of processes, greater responsiveness and continuous monitoring of project quality.<\/p>\n<h3 class=\"section-title\"><strong style=\"color: #002f87; font-size: 22px; text-transform: none !important;\">The strengths of the Contract with an Obligation of Results (COR)<\/strong><\/h3>\n<ul style=\"font-weight: 400;\">\n<li>Total flexibility to evolve the design up to the last moment without incurring additional costs.<\/li>\n<li>Maximum transparency on all services and contracts awarded to companies.<\/li>\n<li>An optimized overall cost thanks to the award of contracts as separate trade packages (CES).<\/li>\n<li>A true obligation of results, backed by a Property Development Contract (CPI), committing to the schedule, price and conformity of the works.<\/li>\n<li>Complete financial security, through a Financial Completion Guarantee (GFA) issued by a bank and covering the entire operation.<\/li>\n<li>Operational simplification for the client, who benefits from a single point of contact and a single contract.<\/li>\n<\/ul>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div>            <\/div>\r\n        <\/div>\r\n    <\/section>\r\n<\/div>\r\n\r\n<div id='sec-grid-skills-4' class='monolit_sec monolit_page_sec content vc_custom_1765192498085'>\r\n\r\n \r\n\r\n    <section>\r\n            <div class=\"container\">\r\n                <div class=\"row\">\r\n                <div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<div class=\"custom-link-holder\"><a class=\"btn anim-button fl-l\" href=\"https:\/\/www.sedri.fr\/en\/our-expertise\/\" data-top-bottom=\"transform: translateY(-50px);\" data-bottom-top=\"transform: translateY(50px);\"><span class=\"no-rep\">Our other services<\/span><i class=\"fa fa-long-arrow-right\"><\/i><\/a><\/div>\n<div><\/div>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div>            <\/div>\r\n        <\/div>\r\n    <\/section>\r\n<\/div>","protected":false},"excerpt":{"rendered":"Le Contrat avec Obligation de R\u00e9sultats (COR) est un montage innovant d\u00e9velopp\u00e9 par SEDRI, associant les avantages d'une mission d\u2019Assistance \u00e0 Ma\u00eetrise d\u2019Ouvrage (AMO) \u00e0 ceux d'un Contrat de Promotion Immobili\u00e8re (CPI). Ce dispositif permet de faire \u00e9voluer l'obligation de moyens d'une mission AMO en phase de conception vers une v\u00e9ritable obligation de r\u00e9sultats d'un [...]","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-fullwidth.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-1936","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.sedri.fr\/en\/wp-json\/wp\/v2\/pages\/1936","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sedri.fr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.sedri.fr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.sedri.fr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sedri.fr\/en\/wp-json\/wp\/v2\/comments?post=1936"}],"version-history":[{"count":228,"href":"https:\/\/www.sedri.fr\/en\/wp-json\/wp\/v2\/pages\/1936\/revisions"}],"predecessor-version":[{"id":3600,"href":"https:\/\/www.sedri.fr\/en\/wp-json\/wp\/v2\/pages\/1936\/revisions\/3600"}],"wp:attachment":[{"href":"https:\/\/www.sedri.fr\/en\/wp-json\/wp\/v2\/media?parent=1936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}